The stone shower tray Splugen 220 is obtained by carving a solid piece and only tailor-made realized. It can be realized in different types of stone and the plug cover can be in metal or stone covered.
Payment is done in national currency at the exchange rate on the settlement day. The standard production time is 21-80 calendar days depending on the position. Estimated production time is being specified at the time of the request. The exact date of manufacture and delivery is negotiated at the time of order.