Partition, vase and lamp, several functions combined in a single, highly appealing element with strong visual and theatrical impact. Made in laser-cut metal, it can also be installed outdoors. Designed for the assembly of an IP 65 kit of two 220V 35W bulbs. Material: metal.
Payment is done in national currency at the exchange rate on the settlement day. The standard production time is 21-80 calendar days depending on the position. Estimated production time is being specified at the time of the request. The exact date of manufacture and delivery is negotiated at the time of order.